2014 Navasota ISD School Bond Information » Proposed Additions & Renovations

Proposed Additions & Renovations

Proposition 1 - $57,769,801

High Point Elementary Additions & Renovations
  • Secured entry vestibule at main entrance
  • Addition to accommodate growth
  • Restroom renovations to accommodate addition
  • Pedestrian safety - downspouts at main entry
  • Site drainage improvements at playground area
  • Relocate playground away from drainage ditch
  • Improve drainage at east side
  • Campus and playground fencing
  • Consider playground canopies
  • ADA non-compliance upgrades
John C. Webb Elementary Renovations & Additions
  • Safety and security improvements with renovations to administration area to provide new secured entry vestibule
  • Pedestrian safety guardrails and handrails at exterior ramps and sidewalks
  • Provide safe and efficient drop off and pick up queuing area
  • Provide safe, secure access to new updated playground areas
  • Additional on-site parking
  • ADA non-compliance upgrades
Intermediate Elementary School
  • Campus safety and security improvements
  • New addition to accommodate grade configuration Pre-K to 5
  • Upgrades to life safety system (fire alarm and fire sprinkler systems)
  • Replace existing roof with new roof
  • ADA non-compliance upgrades
  • New front door, secure entry vestibule, and new administration offices with new addition
  • New pick up and drop off queuing solutions with new drive and parking area
  • New access to gymnasium nearby thru renovations to the "Rock Gym"
  • Add new serving line at kitchen with addition
  • Add new enlarged cafeteria area with addition
  • Provide new safe, secure playground area
  • Maintenance upgrades throughout
  • Mechanical/HVAC upgrades
  • Electrical upgrades throughout
  • Interior & Exterior lighting upgrades
  • Technology upgrades throughout
  • Update finishes and door hardware
Navasota Junior High/Navasota High School Campus
  • Campus safety and security improvements with new secured entry vestibules at each campus
  • Upgrades to life safety systems (fire alarm and fire sprinkler systems)
  • Provide new roof at both campuses
  • New CTE/Fine Arts addition to accommodate student growth
  • New addition at Junior High to accommodate student growth
  • New instructional spaces within renovated area
  • New administration area within renovated area
  • New cafeteria/kitchen/serving addition to serve the High School and Junior High campuses
  • New addition at front of existing high school to accommodate large student instructional space
  • Renovate existing CTE "Ag" building
  • Renovate Science laboratories throughout
  • Upgrade all restroom facilities
  • Provide maintenance upgrades throughout
  • Upgrades to electrical throughout
  • Upgrades to lighting throughout
  • Upgrades to technology throughout
  • Update finishes and door hardware

Propositions 2 - $3,872,000

Brosig Auditorium 
  • Maintenance upgrades
  • Electrical upgrades
  • New exterior and interior lighting
  • Technology infrastructure upgrades
  • ADA non-compliance upgrades
  • Update finishes and door hardware
  • New flooring throughout
  • Mechanical HVAC upgrades
  • Accessible restrooms
  • New lobby area
  • Accessible stage area
  • New exterior building lighting
Administration Building (Historic High School)
  • Maintenance upgrades
  • New exterior building lighting
  • New technology infrastructure upgrades
  • ADA non-compliance upgrades
  • Update finishes and door hardware
  • New flooring throughout
  • New exterior lighting
  • Mechanical/HVAC upgrades